About the Project

Construction is scheduled to start on December 17th between Ed JL Green and Aquarena Springs Drive. 

The project will replace approximately 600 feet of existing 80 year old 12 inch water main. The work will include boring the new water line under the culvert carrying the Sessom Creek.

Work will begin at the intersection of Sessom and Aquarena Springs Drive following TxState Graduation and be complete before class start in January 2019

Work will then continue up Sessom Drive to the intersection with Ed JL Green.

A section of 12-inch waterline under Sessom Drive between Ed JL Green and Aquarena Springs ruptured in November 2017. The rupture occurred where this line currently passes through a box culvert just south of the Salt Grass Restaurant.

This project will provide an engineering design to replace that section of waterline between the stated roads. This section of waterline together with other connected segments are past their useful service life and have suffered several breaks in recent years.

Total project cost is estimated at $300,000.

Webpage Map_Sessom