Cheatham Street & Blanco River Waterline

Project Details


This project will construct two new water lines in two locations. One location is along Cheatham St between CM Allen and near Riverside Drive. This new waterline will be constructed beneath the San Marcos River utilizing horizontal directional drilling (HDD).

Connection


It will connect two existing sections of water line to remove dead ends and create an additional loop for waterline system redundancy. The second location is at Blanco River adjacent to IH-35. An existing water line was damaged during the October 30 2015 flood event. A new water line will be constructed under the Blanco River to replace the existing one.
Cheatham Street Waterline
Cheatham Street Waterline Project location