About the Project

  • This project will replace two existing 20” concrete force main pipes with two proposed 24” PVC pipe
  • Includes the installation of a bulk reclaimed water filling station and a 12” reclaimed waterline
  • A 5’ x 5’ concrete box culvert and six storm sewer crossings will be put along River Road
  • The project now includes the installation of a diversion channel that was originally proposed with the Blanco Gardens Drainage Improvement project
  • Construction is slated to begin June 8