Briarwood and River Ridge Drainage and Waterline 

  • This project will replace an existing waterline currently serving homes from the rear property line to a new 8” water main proposed on Briarwood Drive with services coming into the property from the front property line.  
  • Drainage Improvements are also proposed adjacent to the Grande parcel, storm sewer upgrades near Aspen Heights Apartments and a combination detention/water quality pond will be installed adjacent the Hilton Garden Inn.  
  • Survey crews are currently processing field work and anticipated to be complete by the end of September.  All adjacent property owners to this project have been notified of this project by mail.  
  • Subsurface utility exploration has determined existing utility depths and location of possible conflicts.  Next steps are to complete an environmental study and perform geotechnical borings/infiltration testing on the property adjacent to the Hilton Inn.
  • Construction Estimate - $3.3M                                                 
  • Construction Start – Late 2021
Briarwood Improvements Exhibit