About the Project

Project Name: Main Lift Station Force Main Replacement

Project Number: 111

Project Manager: Rey Garcia

Construction Estimate: $7,700,575

Construction Start: 06/2020

Construction Completion: See Dashboard for details

Project Information: Replace two existing 20" asphaltic concrete force main pipes with two proposed 24" PVC pipes.  Project limits begin at the main lift station close to the intersection of IH-35 and River Road to the wastewater treatment plant (WWTP).  A bulk reclaimed water filling station is also proposed with this project as well as a 12" reclaimed waterline from the intersection of River Road and Cap Road to an existing line inside the WWTP.  Six storm sewer crossings along River Road are also proposed as well as a 5'x5' concrete box culvert along River Road from Cape Road to Conway Drive.  A Diversion Channel, originally to be installed during the Blanco Gardens Drainage Improvements project, was change ordered into this project.

Main Lift Sta Project Map