Sign up to receive a text message or email when new bids are added!
Bid Number: IFB 2020-B14
Bid Title: IFB 2020-B14 Lime Kiln Road Improvements
Category: Construction Highways and Roads
Status: Closed

Description:

The IFB 2020-B14 Lime Kiln Road Improvements project will include the reconstruction of Lime Kiln Road to include a flood zone crossing at Sink Creek, a bridge crossing at San Marcos River, new intersection at Windemere Road and Shale Path, and parts of the existing road will be demolished and two driveway connections added.


Publication Date/Time:
7/30/2020 8:30 AM
Publication Information:
San Marcos Daily Record
Closing Date/Time:
8/20/2020 3:00 PM
Submittal Information:
Hays County Purchasing: 712 South Stagecoach Trail, Ste. 1071, San Marcos, TX 78666
Bid Opening Information:
8/20/2020 @ 3:00 PM
Pre-bid Meeting:
8/5/2020 @ 2:00 PM
Contact Person:
purchasing@co.hays.tx.us
Miscellaneous:
Pre-Bid Meeting Link:
https://teams.microsoft.com/l/meetup-join/19%3ameeting_NTAxMmFhOGItZTBkMi00ZDdjLTkwYjUtMmZiMTE4NzU5MmIy%40thread.v2/0?context=%7b%22Tid%22%3a%22bf1bfd05-3107-4bf6-84cd-92ce598ea9cd%22%2c%22Oid%22%3a%221503286a-9a26-4c80-a7b5-c920468ae5ba%22%7d
Related Documents:
View Document(s)

Return To Main Bid Postings Page